The 50% rule

URA treats works as additions and alterations (A&A) only if all three stay within limits: new floor area of no more than 50% of the existing approved floor area, no more than 50% of the external walls removed or replaced, and structural changes to no more than 50% of the existing building. 1 2 Go past any one of them and it counts as a reconstruction, which is a new house in planning terms.

Some works count as reconstruction regardless: replacing the roof to add a storey, or changing the house type, for example from a semi-D to a bungalow. 1 An attic can be added as A&A if the extra floor area stays under 50%. 1

What each route needs

Both need approval before work starts, submitted by a qualified person such as a registered architect, plus structural plans from a professional engineer. A&A that meets URA’s criteria can go through plan lodgment, which is faster than a full application, and must keep the same house type. 2 A rebuild has to follow today’s envelope, setback and plot rules in full.

Rough costs and timelines

Builders quoted in 2024 put a full rebuild of a terrace or semi-D at roughly S$350 to S$450 psf of built-up area, often S$1.5 million to S$2 million in total, and major A&A at roughly S$200 to S$250 psf, taking about 6 to 16 months. 3 Costs depend heavily on size, soil, basement, finishes and the builder, so get quotes on the actual plot before you rely on any figure.

Allow time on top of construction for design and approvals, and for renting elsewhere while the work is done.

How to choose

A rebuild makes sense when the structure is tired, the layout cannot be fixed within the 50% limits, or the plot sits in a 3-storey area and the current house uses only two. A&A makes sense when the structure is sound and the layout mostly works, or when keeping part of the existing house lets it keep features today’s rules would not allow. 1 Ask a builder or architect to look at the house before you offer, and price the works into what you pay.

This guide is general information, not legal, tax or financial advice. Rules change, so confirm the details for your purchase with the agencies cited and your lawyer, banker or architect.

Sources

  1. Additions and alterations to landed housing — Urban Redevelopment Authority
  2. Plan lodgment: additions and alterations to a landed house — Urban Redevelopment Authority
  3. Renovation and rebuild cost estimates for pure landed homes — PropertyLimBrothers (2024)